Operations
that unlock
energy potential

We operate with excellence, guided by an entrepreneurial team and a pioneering vision.

We operate with a long-term vision, developing the Vaca Muerta formation, one of the world's most significant unconventional resources, with a focus on innovation and technology.

We operate with a strong commitment to people’s safety and process integrity.

timeline
P1 reserves at YE 2024

365.5 MMboe

99% operated, 86% oil
508.8 MMboe pro forma
Production Q3-25

126.3 Mboe/d

operations
~229,000 net acres in the Vaca Muerta formation
Up to 1,653 identified well locations
Potential upside by de-risking additional landing zones
Unconventional concessions expiring in 2050